Changes between Version 2 and Version 3 of ClusterECall030110

Show
Ignore:
Timestamp:
03/01/10 15:56:10 (9 years ago)
Author:
hmussman@bbn.com
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • ClusterECall030110

    v2 v3  
    2727 
    2828                 
    29 11:15am:        Status and plans of all seven GENI WiMAX meso-scale campus deployment projects:[[BR]] 
     2911:15am         Status and plans of all seven GENI WiMAX meso-scale campus deployment projects:[[BR]] 
    3030                Columbia University (1770)      PI: Henning Schulzrinne [[BR]] 
    3131                Henning on 2/8:  Starting application process with IT.  Likely site to be on engineering building, near amateur radio station.  [[BR]] 
     
    3535                Thanasis on 2/8:  Starting applciation process.  Likely site on EE building. [[BR]] 
    3636                Thanasis on 3/1:  Application completed 2/22, for two sites:  EE and Admin buildings. Equipment expected in EE building. [[BR]] 
     37                Ivan on 3/1:  Cables from roof to equipment room include:  dual fiber;  power;  GPS receiver coax;  within 1" dimaeter. 
    3738                 
    3839                UCLA (1797)     PI: Mario Gerla, Giovanni Pau [[BR]] 
     
    5657                Tony on 3/1:  Have received first license, 10MHz overlapping Sprint/Clearwire. Applied 1/12, received 2/24.   Need to change emission designator. 
    5758 
     5911:35am   Planning for meeting, demos at GEC7 
    5860 
     61        Note:  Everyone is invited to a WiMAX BOF dinner or beer event on Tuesday evening;  please respond at http://www.doodle.com/hmmbrzdb4sgdtrbp  
     62 
     63                Note:  Each project is invited to attend the OMIS meeting at GEC7 on Wednesday, 3/17, 3:30pm � 5:30pm 
     64 
     65        Demo at GEC7 [[BR]] 
     66                Ivan on 3/1:  [[BR]] 
     67 
     68        1.) Demo of mobile OMF with location based control and WiMAX support 
     69 
     70        2.) Poster and table space for GENI BaseStation Kit hardware 
     71                 
     72                 
     73                Meeting(s)at GEC7: 
     74                 
     75                 
     76                 
     77                 
     78                [[BR]]Ray:  Please think about the research you want to do, and provide email or input on the wiki;  can help drive design of kit and software. 
     79                 
     80                 
    598111:50   Wrapup:[[BR]] 
    60                 Harry and Ivan:  Please look at, and provide input to, wiki pages.[[BR]] 
    61                 Ray:  Please think about the research you want to do, and provide email or input on the wiki;  can help drive design of kit and software. 
    62  
    63                 Next call?[[BR]] 
    64                 Yes, do between now and GEC7. [[BR]] 
    65                 Harry:  Pick: Monday, March 1, at 11am.  [[BR]] 
    66                  
    67                 Meeting, demos at GEC7[[BR]] 
    68                  
     82                                 
    6983                Workshop at Rutgers to train campuses?[[BR]] 
    7084                All:  Yes, between GEC7 and GEC8, perhaps in June. [[BR]]