Opened 9 years ago

Last modified 9 years ago

#1366 closed

A cyber physical test bed for advanced manufacturing — at Version 3

Reported by: yajun.lu@okstate.edu Owned by: peter.stickney@bbn.com
Priority: major Milestone:
Component: GPO Version: SPIRAL7
Keywords: GEC22 Cc: j.cecil@okstate.edu, zak.zafar@okstate.edu, rahul.chidurala@okstate.edu
Dependencies:

Description (last modified by hdempsey@bbn.com)

Demo Title: A cyber physical test bed for advanced manufacturing

Demo description paragraph(s): This demonstration will be a milestone in the area of Digital Manufacturing and involves showcasing a GENI based cyber physical framework for advanced manufacturing. This Next Internet based framework will enable globally distributed software and manufacturing resources to be accessed from different locations accomplish a complex set of life cycle activities including design analysis, assembly planning, and simulation. The advent of the Next Internet holds the promise of ushering in a new era in Information Centric engineering and digital manufacturing activities. The focus will be on the emerging domain of micro devices assembly, which involves the assembly of micron sized parts using automated micro assembly work cells.

List of equipment that will need AC connections (e.g. laptop, switch, monitor): 5 - 7

Total number of wired network connections (sum standard IP and VLAN connections): 4

Number of static addresses needed (if any): 4

Monitor (y/n, specify VGA or DVI): both

Number of posters (max size poster boards are 30" x 40"): 1 standard size

Please locate two OKSTATE demos next to each other #1362 and #1366

Change History (3)

comment:1 Changed 9 years ago by peter.stickney@bbn.com

Status: newaccepted

Will you be needing 2 LCDs?

Thanks for the demo submission, I will follow up with confirmation of available resources.

Of note, NSF will be looking at this wiki page, so please feel free to update if you notice any errors or wish to update your demo description.

http://groups.geni.net/geni/wiki/GEC22Agenda/EveningDemoSession

comment:2 in reply to:  1 Changed 9 years ago by yajun.lu@okstate.edu

Yes, I will need 2 LCDs. Thanks.

Replying to peter.stickney@…:

Will you be needing 2 LCDs?

Thanks for the demo submission, I will follow up with confirmation of available resources.

Of note, NSF will be looking at this wiki page, so please feel free to update if you notice any errors or wish to update your demo description.

http://groups.geni.net/geni/wiki/GEC22Agenda/EveningDemoSession

comment:3 Changed 9 years ago by hdempsey@bbn.com

Description: modified (diff)

PI requests two OK State demos be co-located.

Note: See TracTickets for help on using tickets.