{6} All Tickets By Milestone (Including closed) (1502 matches)
A more complex example to show how to make advanced reports.
Results (101 - 200 of 1502)
(empty) (100 matches)
Ticket | Summary | Component | Status | Resolution | Version | Type | Priority | Owner | Modified |
---|---|---|---|---|---|---|---|---|---|
#724 | S3Monitor Demonstration | S3MONITOR | closed | fixed | SPIRAL3 | task | major | chaos@bbn.com | 09/26/11 |
#723 | GEC10 demo request - OFUWI: Networking Coding | OFUWI | closed | fixed | SPIRAL3 | task | major | chaos@bbn.com | 09/26/11 |
#719 | Request for GEC10 DEMO/POSTER: Flexible OpenFlow 1.1 switch over Network Processors | GPO | closed | fixed | SPIRAL3 | task | major | chaos@bbn.com | 09/26/11 |
#718 | demo request for GEC10 | MeasurementSys | closed | fixed | SPIRAL3 | task | major | chaos@bbn.com | 09/26/11 |
#717 | Mid-Atlantic Crossroads (MAX) Demo at GEC#10 | MAX | closed | fixed | SPIRAL3 | task | major | chaos@bbn.com | 09/26/11 |
#715 | Poster/Demo request ticket for "GENI Experiments on P2P, MANET, WSN and Federated Networks" | GPO | closed | fixed | SPIRAL2 | task | major | chaos@bbn.com | 09/26/11 |
#713 | Serval demo | SCAFFOLD | closed | fixed | SPIRAL3 | task | major | chaos@bbn.com | 09/26/11 |
#708 | University of Washington OpenFlow Demo | OFUWA | closed | fixed | SPIRAL3 | task | major | chaos@bbn.com | 09/26/11 |
#706 | K-GENI and Virtualized Programmable Platform GEC10 Demo | KGENI | closed | fixed | SPIRAL3 | task | major | chaos@bbn.com | 09/26/11 |
#704 | ProtoGENI GEC10 Demo | PROTOGENI | closed | fixed | SPIRAL3 | task | major | chaos@bbn.com | 09/26/11 |
#703 | GEC10 demo request - OFCLEM | OFCLEM | closed | fixed | SPIRAL3 | task | major | chaos@bbn.com | 09/26/11 |
#702 | GPO Wimax Demo | WIMAX | closed | fixed | SPIRAL3 | task | major | chaos@bbn.com | 09/26/11 |
#701 | OnTimeMeasure GEC10 Demo | ONTIME | closed | fixed | SPIRAL3 | task | major | chaos@bbn.com | 09/26/11 |
#700 | GEC10 Demo for Washington University SPP Project | SPP | closed | fixed | SPIRAL3 | task | major | chaos@bbn.com | 09/26/11 |
#699 | MPLS-OpenFlow based access/aggregation network | GPO | closed | fixed | SPIRAL3 | task | major | chaos@bbn.com | 09/26/11 |
#698 | OpenFlow GEC10 Demo | OFIU | closed | fixed | SPIRAL3 | task | major | chaos@bbn.com | 09/26/11 |
#697 | Wisconsin Mobile Offloading GEC10 Demo | OFUWI | closed | fixed | SPIRAL3 | task | major | chaos@bbn.com | 09/26/11 |
#695 | The Kentucky Portal and Archival System | INSTOOLS | closed | fixed | SPIRAL3 | task | major | chaos@bbn.com | 09/26/11 |
#694 | KanseiGenie GEC10 demo | KANSEI | closed | fixed | SPIRAL3 | task | major | chaos@bbn.com | 09/26/11 |
#693 | Demo for Secure Updates... | SECUREUPDATES | closed | fixed | SPIRAL3 | task | major | chaos@bbn.com | 09/26/11 |
#692 | Demo space for MNG / Seattle | MILNGENI | closed | fixed | SPIRAL3 | task | major | chaos@bbn.com | 09/26/11 |
#770 | New git repository for nox controllers | GPO | closed | invalid | SPIRAL3 | task | major | chaos@bbn.com | 06/25/11 |
#689 | Plan for GEC10 demos | GPO | closed | fixed | SPIRAL3 | task | major | chaos@bbn.com | 03/29/11 |
#683 | Create mailing list: genicloud-users@geni.net | GPO | closed | invalid | SPIRAL3 | task | major | chaos@bbn.com | 01/05/11 |
#559 | Please create GEC9 report link for Ticket Reports section on public geni wiki and remove GEC8 link | GPO | closed | invalid | SPIRAL2 | task | major | chaos@bbn.com | 09/16/10 |
#497 | Need mailing list for gush-users. | GPO | closed | invalid | SPIRAL2 | task | minor | chaos@bbn.com | 08/09/10 |
#252 | wiki login for Michael Freedman @ Princeton, password help | GPO | closed | fixed | SPIRAL2 | task | major | chaos@bbn.com | 07/06/10 |
#436 | please revert kell.gpolab vm to snapshot-1. | GPO | closed | fixed | SPIRAL2 | task | major | chaos@bbn.com | 05/24/10 |
#303 | Seung-Jong Park needs wiki password reset. | GPO | closed | fixed | SPIRAL2 | task | major | chaos@bbn.com | 02/02/10 |
#256 | PlanetLab cluster mailing list on lists.geni.net | GPO | closed | invalid | SPIRAL2 | task | minor | chaos@bbn.com | 11/16/09 |
#231 | batch entry of milestones into wiki | GPO | closed | invalid | SPIRAL2 | task | major | chaos@bbn.com | 10/26/09 |
#230 | difficulty entering text into wiki | GPO | closed | invalid | SPIRAL1 | task | major | chaos@bbn.com | 10/26/09 |
#229 | Create mailing list for new Instrumentation and Measurement Working Group | GPO | closed | invalid | SPIRAL2 | task | major | chaos@bbn.com | 10/26/09 |
#222 | New Milestone macro for trac wiki | GPO | closed | invalid | SPIRAL2 | task | minor | chaos@bbn.com | 10/20/09 |
#27 | Open SECARCH ticket doesn't show up under SECARCH milestone in Roadmap. | GPO | closed | invalid | SPIRAL1 | defect | minor | chaos@bbn.com | 01/26/09 |
#14 | unable to associate milestone with ticket | GPO | closed | invalid | SPIRAL1 | task | major | chaos@bbn.com | 12/09/08 |
#255 | NetKarma White Paper | NETKARMA | closed | invalid | SPIRAL2 | task | major | chris@bbn.com | 05/19/15 |
#193 | MAX connection over I2 to ProtoGENI | MAX | closed | invalid | SPIRAL1 | task | major | chris@maxgigapop.net | 05/19/15 |
#250 | SPP GPE Board failure at Salt Lake City Pop | SPP | closed | wontfix | SPIRAL1 | defect | major | chsmall@grnoc.iu.edu | 10/02/14 |
#202 | No carrier on ProtoGENI HP switch port A19 at I2 SALT | PROTOGENI | closed | invalid | SPIRAL1 | task | major | chsmall@indiana.edu | 05/19/15 |
#1094 | 'Path Setup failed with error from PSSSetup' reported for I2/ION aggregate | I2AM | closed | wontfix | SPIRAL5 | defect | major | ckotil@grnoc.iu.edu | 05/19/15 |
#1205 | Unknown internal failure reported by ION aggregate for complex topology | STITCHING | closed | wontfix | SPIRAL6 | defect | major | ckotil@grnoc.iu.edu | 05/19/15 |
#1209 | Mismatch in getversion code_tag and for ION and MAX aggregates | STITCHING | closed | fixed | SPIRAL6 | major | ckotil@grnoc.iu.edu | 06/26/14 | |
#1047 | ION/I2 Aggregate fails reports error for link that does not go through ION | I2AM | closed | fixed | SPIRAL5 | defect | major | ckotil@grnoc.iu.edu | 06/18/13 |
#1045 | ION/I2 Aggregate fails to create circuit 51 times for one create sliver | I2AM | closed | fixed | SPIRAL5 | defect | blocker | ckotil@grnoc.iu.edu | 06/13/13 |
#1036 | Advertisement rspec for internet2 aggregate does not pass rspeclint | I2AM | closed | fixed | SPIRAL5 | defect | minor | ckotil@grnoc.iu.edu | 06/07/13 |
#1035 | Circuit status falls back from 'ready' into 'changing' in sliverstatus query | GPO | closed | fixed | SPIRAL5 | task | major | ckotil@grnoc.iu.edu | 06/03/13 |
#1032 | The ION aggregate should trust ch.geni.net | I2AM | closed | fixed | SPIRAL5 | task | major | ckotil@grnoc.iu.edu | 05/30/13 |
#1019 | ION AM Ad lists wrong AM URL | I2AM | closed | fixed | SPIRAL5 | task | major | ckotil@grnoc.iu.edu | 04/30/13 |
#1020 | ION AM Ad does not use stitching namespace | I2AM | closed | fixed | SPIRAL5 | defect | critical | ckotil@grnoc.iu.edu | 04/30/13 |
#1247 | request for GENI-VIRO demo at GEC20 | GPO | closed | duplicate | SPIRAL6 | major | Demo description paragraph (three sentence minimum): List of equipment that will need AC connections (e.g. laptop, switch, monitor): Just put in the number of connections needed if your demo description already lists equipment. Total number of wired network connections (sum standard IP and VLAN connections): Number of wired layer 2 VLANs (if any): Specify VLAN number, if known, approximate bandwidth, and whether tagged or untagged. Number of wireless network connections (include required bandwidth if significant): Number of static addresses needed (if any): Monitor (y/n, specify VGA or DVI): Specify resolution only if your software has resolution restrictions. Number of posters (max size poster boards are 30" x 40"): Special requests: Include any specific network connectivity needs (e.g. VLANs to a particular GENI location, projects you'd like to be near, etc.) | 05/13/14 | |
#1246 | request for GENI-VIRO demo at GEC20 | GPO | closed | invalid | SPIRAL6 | major | Demo description paragraph (three sentence minimum): List of equipment that will need AC connections (e.g. laptop, switch, monitor): Just put in the number of connections needed if your demo description already lists equipment. Total number of wired network connections (sum standard IP and VLAN connections): Number of wired layer 2 VLANs (if any): Specify VLAN number, if known, approximate bandwidth, and whether tagged or untagged. Number of wireless network connections (include required bandwidth if significant): Number of static addresses needed (if any): Monitor (y/n, specify VGA or DVI): Specify resolution only if your software has resolution restrictions. Number of posters (max size poster boards are 30" x 40"): Special requests: Include any specific network connectivity needs (e.g. VLANs to a particular GENI location, projects you'd like to be near, etc.) | 05/13/14 | |
#1282 | PG/IG aggregates ignore the stitching availVLANRange if the suggested is 'any' | STITCHING | new | SPIRAL6 | major | duerig@flux.utah.edu | 10/06/14 | ||
#1038 | Manifest rspec for PG and IG does not pass rspeclint | STITCHING | new | SPIRAL5 | defect | minor | duerig@flux.utah.edu | 07/16/14 | |
#1101 | stitching raw-pc at PG or IG requires capacity to be defined unlike xen and openvz, which do not | STITCHING | new | SPIRAL5 | defect | major | duerig@flux.utah.edu | 09/06/13 | |
#1044 | Duplicate IP addresses configured in Utah PG to InstaGENI Utah sliver with multiple links | STITCHING | new | SPIRAL5 | defect | major | duerig@flux.utah.edu | 08/01/13 | |
#1039 | Stitching slivers with Utah InstaGENI end point requires that capacity must be specified for link | STITCHING | new | SPIRAL5 | defect | major | duerig@flux.utah.edu | 08/01/13 | |
#1048 | Requesting link below minimumReservableCapacity does not generate error and allocates default | STITCHING | new | SPIRAL5 | defect | major | duerig@flux.utah.edu | 06/10/13 | |
#1097 | Stitching request for two links between InstaGENI nodes fails while VLANs are available | STITCHING | closed | fixed | SPIRAL5 | defect | major | duerig@flux.utah.edu | 06/26/14 |
#1086 | Unable to exchange Iperf tcp data traffic between PG and IG nodes | STITCHING | closed | fixed | SPIRAL5 | defect | major | duerig@flux.utah.edu | 03/13/14 |
#1085 | Stitching slivers /etc/hosts entries incorrect for remote nodes | STITCHING | closed | fixed | SPIRAL5 | defect | major | duerig@flux.utah.edu | 07/01/13 |
#155 | DTUNNELS GEC5 demo | BGPMUX | closed | fixed | SPIRAL1 | task | major | feamster@cc.gatech.edu | 10/18/09 |
#1500 | Add AWS servers for new clearinghouse and portal to MX records for geni.net | GPO | assigned | SPIRAL8 | major | hdempsey@bbn.com | 12/14/16 | ||
#1498 | Move U of Kentucky MCV IG rack to production | GPO | assigned | SPIRAL8 | major | hdempsey@bbn.com | 11/15/16 | ||
#1421 | Move Clemson OpenGENI rack to production | GPO | accepted | SPIRAL7 | major | hdempsey@bbn.com | 03/10/15 | ||
#1417 | Move Stanford InstaGENI rack to production | GPO | accepted | SPIRAL7 | major | hdempsey@bbn.com | 02/18/15 | ||
#1422 | Move GPO OpenGENI rack to production | GPO | accepted | SPIRAL7 | major | hdempsey@bbn.com | 02/18/15 | ||
#1420 | Move U Chicago InstaGENI rack to production | GPO | accepted | SPIRAL7 | major | hdempsey@bbn.com | 02/18/15 | ||
#1419 | Move CENIC InstaGENI rack to production | GPO | accepted | SPIRAL7 | major | hdempsey@bbn.com | 02/18/15 | ||
#1418 | Move University of Kentucky InstaGENI rack to production | GPO | accepted | SPIRAL7 | major | hdempsey@bbn.com | 02/18/15 | ||
#1416 | Move MOXI InstaGENI rack to production | GPO | accepted | SPIRAL7 | major | hdempsey@bbn.com | 02/18/15 | ||
#1342 | Move University of Kansas InstaGENI rack to production | GPO | assigned | SPIRAL7 | major | hdempsey@bbn.com | 02/18/15 | ||
#1266 | Move MOXI CIC network aggregate to production status | GPO | accepted | SPIRAL6 | major | hdempsey@bbn.com | 06/17/14 | ||
#1409 | Move Internet2 AL2S aggregate to production | GPO | closed | fixed | SPIRAL7 | major | hdempsey@bbn.com | 02/09/15 | |
#1270 | Move SOX GENI rack to production status | GPO | closed | fixed | SPIRAL6 | major | hdempsey@bbn.com | 10/03/14 | |
#1293 | Move Starlight OpenFlow aggregate to production status | GPO | closed | fixed | SPIRAL6 | major | hdempsey@bbn.com | 09/24/14 | |
#1297 | Move CENIC OpenFlow aggregate to production status | GPO | closed | fixed | SPIRAL6 | major | hdempsey@bbn.com | 09/23/14 | |
#1268 | Move University of Illinois at Urbana-Champaign (UIUC) InstaGENI rack to production status | GPO | closed | fixed | SPIRAL6 | major | hdempsey@bbn.com | 06/17/14 | |
#1265 | University of Kentucky Operations Monitoring | GPO | closed | wontfix | SPIRAL6 | major | hdempsey@bbn.com | 06/17/14 | |
#1155 | Move University of Wisconsin-Madison rack to production status | GPO | closed | fixed | SPIRAL6 | task | major | hdempsey@bbn.com | 06/16/14 |
#1147 | Move NYU GENI rack to production status | GPO | closed | fixed | SPIRAL6 | task | major | hdempsey@bbn.com | 06/11/14 |
#1145 | Move University of Missouri-Columbia GENI rack to production status | GPO | closed | fixed | SPIRAL6 | task | major | hdempsey@bbn.com | 05/28/14 |
#1143 | Move MAX GENI rack to production status | GPO | closed | fixed | SPIRAL6 | task | major | hdempsey@bbn.com | 05/28/14 |
#1144 | Move Clemson InstatGENI GENI rack to production status | GPO | closed | fixed | SPIRAL6 | task | major | hdempsey@bbn.com | 05/06/14 |
#1104 | Move Georgia Tech GENI rack to production status | GPO | closed | fixed | SPIRAL5 | task | major | hdempsey@bbn.com | 03/03/14 |
#1165 | Move Cornell University InstaGENI rack to production status | GPO | closed | fixed | SPIRAL6 | task | major | hdempsey@bbn.com | 02/18/14 |
#1149 | Cisco poster at OSU-MU table | GPO | closed | fixed | SPIRAL6 | task | major | hdempsey@bbn.com | 10/27/13 |
#1105 | Move NYSERNet GENI rack to production status | GPO | closed | fixed | SPIRAL5 | task | major | hdempsey@bbn.com | 10/17/13 |
#1106 | Users with an Upper case letter in their username get an error | I2AM | closed | invalid | SPIRAL5 | task | major | hdempsey@bbn.com | 09/18/13 |
#1098 | Move University of Utah Downtown Data Center GENI rack to production status | GPO | closed | fixed | SPIRAL5 | task | major | hdempsey@bbn.com | 08/26/13 |
#892 | status update for IU OpenFlow workshops | GPO | closed | fixed | SPIRAL4 | task | major | hdempsey@bbn.com | 08/26/13 |
#940 | Project 1868 has updated status reports, please update project page to show milestons have been met | GPO | closed | fixed | SPIRAL4 | task | major | hdempsey@bbn.com | 08/26/13 |
#35 | Obtain publicly-announceable GENI IP addresses | BGPMUX | closed | wontfix | SPIRAL2 | task | major | hdempsey@bbn.com | 02/05/13 |
#344 | Collaboration between GMOC and CMUlab | GPO | closed | fixed | SPIRAL1 | task | major | hdempsey@bbn.com | 04/24/12 |
#680 | Plan install and upgrade work in Atlanta | GPO | closed | fixed | SPIRAL3 | task | major | hdempsey@bbn.com | 04/24/12 |
#681 | Plan intall work in Houston | GPO | closed | fixed | SPIRAL3 | task | major | hdempsey@bbn.com | 04/24/12 |
#786 | Plan for GEC12 demos | GPO | closed | fixed | SPIRAL4 | task | major | hdempsey@bbn.com | 11/16/11 |
#837 | Plenary demo: uCap | GPO | closed | fixed | SPIRAL3 | task | major | hdempsey@bbn.com | 11/16/11 |
#785 | Plan for GEC12 demos | GPO | closed | invalid | SPIRAL3 | task | major | hdempsey@bbn.com | 09/25/11 |
#771 | BBN Aggregate Emergency Stop Request for plastic-104 slice (TEST) | GPO | closed | fixed | SPIRAL3 | task | blocker | hdempsey@bbn.com | 06/29/11 |
Note:
See TracReports for help on using and creating reports.