Timeline
09/26/12:
- 11:43 Ticket #114 (Unable to SSH into bare metal nodes) closed by
- fixed: Thank you! I am able to login to both bare metal nodes now. Closing …
- 10:23 Ticket #114 (Unable to SSH into bare metal nodes) created by
- Created a sliver via the ExoSM named "lnexo", which requested one bare …
- 09:42 Ticket #113 (Redirection error on bbn-w7) created by
- While I was logged in to bbn-hn just now, I got this message in my …
- 09:22 Ticket #112 (ImageProxy unable to retrieve image failure reported for) created by
- Created a 1-node on shared VLAN 1750, and the sliver status reports a …
- 09:13 Ticket #111 (FOAM sliver not cleared at expiration time) created by
- Expired FOAM slivers are not cleared at the ExoGENI FOAM. In a …
09/05/12:
- 09:29 Ticket #108 (Unable to renew sliver at ExoSM) closed by
- fixed: Closing this ticket and tracking issue resolution in ticket #59.
09/04/12:
- 16:37 Ticket #110 (SSH Keys: The keys of only one user are installed in the nodes) created by
- Createsliver gives the capability to a user to provide login …
- 16:33 Ticket #109 (SSH Keys: Only one ssh key is installed) created by
- If in createsliver a user specifies multiple public ssh keys to be …
09/02/12:
- 15:39 Ticket #108 (Unable to renew sliver at ExoSM) created by
- Attempts to renew several slivers each fail as follows: […]
08/29/12:
- 13:55 Ticket #95 (FlowVisor version) closed by
- fixed: Victor and I talked on IRC, and concluded: […] and […] So, …
Note: See TracTimeline
for information about the timeline view.